TITLE 4. THE PHILADELPHIA BUILDING CONSTRUCTION AND OCCUPANCY CODE
SUBCODE "A" (THE PHILADELPHIA ADMINISTRATIVE CODE)
SECTION A-903.0 ELECTRICAL CODE FEES [13]
A-903.1 General: Fees for permits and licenses related to
activity regulated by the Electrical Code shall be as set forth in this
section.
A-903.2 Electrical permit fees: The permit fee for electrical
work shall be $25.00 for each $1,000.00 or fraction thereof of estimated
electrical construction costs. The minimum fee shall be $25.00. The maximum fee
shall be $7,500.00. The construction costs shall be determined in accordance
with Section A-902.3.
A-903.2.1 Pre-paid permits: The department is
authorized to print application blanks which shall be sold to licensed
electrical contractors in the amount of $25.00 and $50.00 each. Such completed
applications shall be accepted by the department for specific types of
alteration projects to be determined by the department.
A-903.2.2 Annual
permit: The fee for an annual permit issued pursuant to the Electrical Code
shall be $1000.00 per annum payable June 1 of each
year.
A-903.3 Electrical inspection agent license: The license fee for an
electrical inspection agency shall be $1,500.00 for the first year and $1,900.00
for each subsequent year, payable annually.
A-903.4 Electrical inspector
license: The fees for obtaining and renewing a license as an electrical
inspector shall be as follows:
|
1. Application:.........................
|
$50.00
|
|
2. Initial license and annual
renewals:.........................................
|
$100.00
|
A-903.5 Electrical contractor license: The fees for
obtaining and renewing a license as an electrical contractor shall be as
follows:
|
1. Application:.........................
|
$50.00
|
|
2. Initial license and annual
renewals:.........................................
|
$100.00
|
The application fees are in addition to any fees charged
by an agency which the department authorizes to administer the
examination.