TITLE 4. THE PHILADELPHIA BUILDING CONSTRUCTION AND OCCUPANCY CODE
SUBCODE "A" (THE PHILADELPHIA ADMINISTRATIVE CODE)
SECTION A-904.0 FIRE PREVENTION CODE FEES
|
1. Bowling Lane Resurfacing/
Bowling Pin Refinishing.....Per operation |
|
|
|
|
|
2. Tent/Air Supported
Structure................ Per tent or structure |
|
|
|
|
|
3. Welding or Cutting............Per operation
|
|
|
|
|
|
4. Transportation of Explosives,
less than 1,000 pounds (454 kg)........................Per operation |
|
|
|
|
|
5. Use of Explosives..............Per operation
|
|
|
|
|
|
6. Tank Alteration or Repair..........Per tank
|
|
|
|
|
|
7. Tank Installation......................Per tank
|
|
|
|
|
|
8. Oil Burner Installation...............Per unit
|
|
|
|
|
Removal..............................Per tank
|
|
|
|
|
|
10. Underground Tank Test.............Per tank
|
|
Testing Fire
Pumps............Per pump
|
|
|
1,000 pounds
(454 kg) or
more........................Per movement |
|
|
|
3. Fireworks Display...............Per event
|
|
Category
|
|
|---|---|
|
1. Family Child Day Care Home.........
|
I
|
|
|
|
|
2. Crop-ripening and Coloring............
|
II
|
|
|
|
|
3. Dry Cleaning Plant.....................
|
II
|
|
|
|
|
4. Finishing Shop...........................
|
II
|
|
|
|
|
5. Storage of Lumber......................
|
III
|
|
|
|
|
6. Organic Coating Manufacture......
|
II
|
|
|
|
Junk Yard or Waste
Material
Handling Facility...................... |
III
|
|
|
|
|
8. Acetylene Generator....................
|
II
|
|
|
|
|
9. Motor Vehicle Repair Shop............
|
II
|
|
|
|
|
A. Mechanical repair
|
|
|
B. Body repair with painting
|
|
|
C. Body repair without painting
|
|
|
Category
|
|
|---|---|
Contracting................................
|
II
|
|
|
|
|
2. Fire Alarm Systems Inspector..........
|
II
|
|
|
|
|
3. Welding or Cutting.......................
|
I
|
|
|
|
|
4. Transporter of Explosives...............
|
I
|
|
|
|
|
5. Use of Explosives........................
|
I
|
|
|
|
|
6. Tank Installation and Repair............
|
I
|
|
|
|
|
7. Oil Burner Installation and Repair......
|
I
|
|
|
|
Tank and
Equipment Tester............
|
I
|
|
1. Tank Installation and Repair
|
|
2. Oil Burner Installation and Repair
|
|
1. Manufacture or Storage of Matches
|
|
|
|
2. Cylinder Storage, Gas Welding or Cutting
|
|
|
|
3. Storage of Calcium Carbide
|
|
|
|
4. Cylinder Storage, Welding or Cutting, Acetylene
Generator
|
|
|
|
5. Storage or Sale of Aerosol Products
|
|
|
|
6. Storage or Handling of Cellulose Nitrate (Pyroxylin)
Plastics
|
|
|
|
7. Compressed Gas
|
|
|
|
8. Storage or Use of Corrosives
|
|
|
|
9. Cryogenic Liquids
|
|
|
|
10. Explosive Materials
|
|
|
|
11. Flammable and Combustible Liquids Handling
|
|
|
|
12. Flammable Solids
|
|
|
|
13. Toxic Solids and Liquids
|
|
|
|
14. Irritants, Sensitizers and Health Hazards
|
|
|
|
15. Liquified Petroleum Gas
|
|
|
|
16. Organic Peroxides
|
|
|
|
17. Liquid and Solid Oxidizers
|
|
|
|
18. Pyrophoric Materials
|
|
|
|
19. Radioactive Materials
|
|
|
|
20. Unstable (Reactive) Materials
|
|
|
|
21. Water-Reactive Materials
|
|
|
|
22. Flammable and Combustible Liquids Stationary Tank
Storage............$75.00 per tank;
$2,250.00 maximum per facility
|
|
1. Variance Appeal to the Board of
Safety and Fire Prevention.......100.00 per building
|
|
|
|
2. Automatic Fire Suppression
and/or Standpipe System Test Permit.........................$30.00 per test
|
|
|
|
3. Lawful Occupancy Sign (See
A-302.6.5 for initial issue).......$20.00 for replacement of a
lost or damaged sign |
|
|
|
4. High-Rise Building
Inspection Fee.............................$0.01 per square foot per year
|
|
|
|
5. Regulated Facility Hazardous
Chemical Fee......................$75.00 per chemical per year
|
|
|
|
6. Emergency Planning Fee.........$100.00
per year
|