SECTION E-2703.0 INSPECTIONS AND TESTS


E-2703.1 During Installation: During the installation of electric systems and equipment, the code official shall make inspections to ensure compliance with the provisions of this chapter. It shall be the responsibility of the licensed electrical contractor to arrange for inspections of electrical work. At least 24 hours advance notice shall be given for inspections. Arrangements shall be made for final inspections within five (5) days after the completion of the job.

E-2703.1.1 Agency inspection: The code official is authorized to accept a certification from a licensed Electrical Inspection Agency as evidence of compliance with this chapter in lieu of inspections by the code official.

E-2703.2 Concealing work: Work in connection with an electric system shall not be covered or concealed until such work has been inspected and approved.

E-2703.3 Final inspection and test: On completion of the work, the code official shall inspect the work and cause tests to be made of the operation of the entire system to insure compliance with all requirements. Electrical energy shall not be authorized until an inspection and approval is issued by a licensed electrical inspector.